--- title: "St George's Square exterior | Mr Wallcover" url: https://www.mrwallcover.com/projects/pimlico-st-georges-square/ description: "Full exterior on St George's Square, Pimlico, in 2024: scaffolding supplied and managed, masonry and render painting, windows and entrance ironwork." author: "Dorin Burcus" last_updated: 2026-10-22 --- St George's Square, Pimlico, London # St George's Square, Pimlico A full exterior on St George's Square in 2024: scaffold supplied and managed by us, masonry and render repairs, painting, windows and the entrance ironwork. ![Finished white columned entrance and black railings on St George's Square, Pimlico, with the scaffold down.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-11-800.webp) ## Project record Client, materials & project facts **Client** : Private residential building **Designer** : –Not recorded **Main contractor** : –Not recorded **Maker and paper** : –Not recorded **Area or rooms** : –Not recorded **Scope** : Full exterior, scaffolding supplied and managed **Year** : 2024 ## At a glance - **Building:** a stucco townhouse of flats on St George’s Square, Pimlico - **Survey:** June 2024 - **Works:** July to November 2024. The scaffold was struck in late November 2024 - **Scope:** full front and rear exterior. Scaffolding supplied and managed by us ## The work The survey was in June 2024. Works ran from July to November 2024, and the scaffold came down in late November. We supplied and managed the scaffold for the front and the rear. Repairs took in the cornice, the pediment and the portico, where cracks were made good, and the parapet. Masonry and render were painted in a Dulux Trade system. Sills and entrance joinery, the columns, the balustrade and the railings were finished with the elevation. A private residential building, named here by street only. ## Photographs ![Front elevation on St George's Square under scaffold, with a columned portico and sash windows.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-02-800.webp) ![Scaffolded corner on St George's Square, with the cornice and upper sash windows.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-04-800.webp) ![Close view of a white stucco cornice and sash window on St George's Square, with scaffold poles in front.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-03-800.webp) ![Upper facade on St George's Square under scaffold, with sash windows, a cornice and a black balcony railing.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-08-800.webp) ![Ground-floor entrance on St George's Square under scaffold, with white columns, steps and black railings.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-07-800.webp) ![Rear brick elevation on St George's Square, seen from an upper balcony, under scaffold and sheeting.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-01-800.webp) ![Rear elevation on St George's Square under a full scaffold, red brick and white render, with paint buckets on the boards.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-06-800.webp) ![Close view of a white stucco cornice on St George's Square, with scaffold beside the moulding.](https://www.mrwallcover.com/media/img/r/pimlico-st-georges-square-exterior-10-800.webp) How the exterior work was carried out ## Survey, access, repairs and finishing. The exterior commissions at Inverness Terrace and St George's Square each covered the front and rear of a residential building. The case study records the scope, dates and finished surfaces for this project. 01 ### A defined exterior scope Both records cover a full front and rear exterior. The scope includes the building's masonry or render, architectural details and windows. 02 ### Scaffolded access The buildings were scaffolded for the exterior work. Mr Wallcover supplies and manages scaffolding as part of the exterior service; the St George's Square record includes its strike in late November 2024. 03 ### Repairs before the finish Stucco, masonry and render repairs formed part of these commissions. The individual record identifies the cornices, cracks and other areas made good before the paint finish. 04 ### The architectural details The scope extended beyond the flat elevation: cornices, windows and entrance details were included. Balconies and the portico appear in the Inverness Terrace record; columns, balustrade and railings at St George's Square. 05 ### The recorded paint finish Dulux Trade finishes are recorded on both projects. The case study describes what was used on that building; it is not a universal paint specification for a different substrate or condition. 06 ### The actual programme The dates and photographs belong to the completed commission. Inverness Terrace records return visits in October and December 2018; St George's Square records works from July to November 2024. A new project needs its own scope and programme. [Read about exterior decorating, repairs and scaffolded access](https://www.mrwallcover.com/services/exterior-works/) For our wallcovering work: [See the finish up close: seams, internal corners, edges and joins from our own installations](https://www.mrwallcover.com/details/) By [Dorin Burcus](https://www.mrwallcover.com/about/#dorin), founder · Last updated 22 October 2026