taxonomy().concept(ferc:ScheduleEnergyStorageOperationsSmallPlantsAbstract).label("http://ferc.gov/form/2020-01-01/roles/label/F1Instructions").text
- Small Plants are plants less than 10,000 Kw.
- In columns (a) and (b) report the name of the energy storage project, and location.
- In column (c), report project plant cost including but not exclusive of land and land rights, structures and improvements, energy storage equipment and any other costs associated with the energy storage project.
- In column (d), report operation expenses excluding fuel, (e), maintenance expenses, (f) fuel costs for storage operations and (g) cost of power purchased for storage operations and reported in Account 555.1, Power Purchased for Storage Operations. If power was purchased from an
affiliated seller specify how the cost of the power was determined.
- If any other expenses, report in column (h) and footnote the nature of the item(s).
|
| 36 |
TOTAL |
|
max(list([covered @concept=ferc:ProjectPlantCostSmallPlants @period = $currentDuration]))
$92,477,242
|
max(list([covered @concept=ferc:OperationExpenseExcludingFuel @period = $currentDuration]))
$15,256,784
|
max(list([covered @concept=ferc:MaintenanceExpenseEnergyStorageOperationsSmallPlants @period = $currentDuration]))
$92,477,242
|
max(list([covered @concept=ferc:FuelUsedInStorageOperations @period = $currentDuration]))
$15,256,784
|
max(list([covered @concept=ferc:PowerPurchasedForStorageOperationsSmallPlants @period = $currentDuration]))
$92,477,242
|
max(list([covered @concept=ferc:OtherExpenses @period = $currentDuration]))
$15,256,784
|